Sunkar Medical Centre

Autonomous heat supply for a medical centre based on a 200 kW Cronos BB-2035 boiler with a complete hydraulic module and weather-compensated controls.

Sunkar Medical Centre
Capacity
200 kW
Equipment
Cronos BB-2035
Discipline
Heating
Task

Provide the medical centre with stable heating and hot water, with spare capacity for expansion and the ability to service the plant without shutting the building down.

Disciplines
Equipment
  • Cronos BB-2035 boiler, 200 kW
What we did
  1. 01Selected and installed a 200 kW Cronos BB-2035 boiler.
  2. 02Installed the boiler hydraulic module: safety group, expansion vessels, circulation pumps, distribution manifold.
  3. 03Set up weather-compensated controls and routed the alarm outputs.
  4. 04Commissioned the plant to its design parameters and trained the client's staff.
Result
  • The autonomous boiler plant covers the building's heating and hot water.
  • The site has been placed under a Hydrosta maintenance contract.

Describe your site — an engineer will visit and run the numbers

Site visit, measurements and a technical brief. You receive an itemised estimate and a system layout.

Free consultation

We will call you back

Leave your name and phone number and we will call you during business hours. The consultation is free.

We use your name and phone number only to call you back.