Ventilation
Supply and extract systems with room-by-room air balance calculations. This is where clients most often overpay for surplus capacity — and where we know how to save without compromising the standards.
We cover the discipline end to end
From the first calculation to the signed acceptance report. Every item below is work done by our own engineers and crews, not by outside subcontractors.
Air-change calculation
Air-change rates and balances per room, based on standards and the actual use of each zone — not “per square metre”.
Design and audit
Developing the package from scratch, or auditing and redesigning an existing solution with a revised estimate.
Air handling units
VTS, Flowair and other ranges, units with heat recovery, ducted and rooftop systems.
Ductwork
Galvanised, spiral-wound, insulated. Fabrication, installation and sealing to the required leakage class.
Special systems
Smoke extract, local exhaust, vehicle exhaust extraction in service bays, ventilation for paint shops.
Balancing and commissioning
Flow measurement, adjustment of control devices, aerodynamic test reports.
Where we do it
Facility types where we deliver “ventilation” most often.
- Car dealerships and service areas
- Medical centres
- Shopping and business centres
- Production workshops
- Restaurants and kitchens
- Water parks and swimming pools
What it looks like on site
Five steps from the call to maintenance
The process is the same for every discipline — only the content of the project changes.
- EnquiryWe take in the task: facility type, floor area, timeline. We reply on WhatsApp.
- Site visitAn engineer visits the site, takes measurements and records the technical conditions.
- Design and estimateLoad calculations, schematics, equipment schedule and a transparent itemised estimate.
- InstallationOwn crews, own vehicle fleet, designer's supervision and commissioning with test reports.
- Warranty and maintenanceService centre, scheduled maintenance and emergency call-outs under contract.
Most common questions
Often — yes, and substantially. At the MyCar dealership in Almaty (28,000 m²) we recalculated the air balances, redesigned the system on Flowair equipment and cut the estimate by 30% and the design energy consumption by 50%. The standards were fully maintained.
Other disciplines
Need a project for “ventilation”?
Site visit, measurements and a technical brief. You receive an itemised estimate and a system layout.