Healthcare · Almaty
Institute of Reproductive Medicine (IRM)
Two Vans-2000 boilers with a combined capacity of 400 kW for a clinic where a heating outage is unacceptable.

- Capacity
- 400 kW
- Configuration
- 2 × Vans-2000
- Redundancy
- Cascade
Task
A reproductive medicine clinic cannot tolerate a heating outage: laboratories and operating theatres require a stable temperature around the clock.
Disciplines
Equipment
- 2 × Vans-2000, 400 kW
What we did
- 01Installed a cascade of two Vans-2000 boilers with a combined capacity of 400 kW.
- 02Implemented a redundant configuration: if one boiler fails, the second takes over the load.
- 03Built the manifold assembly with separate circuits for each zone of the building.
- 04Commissioned the cascade controller and configured hot-water priority.
Result
- Full redundancy of the heat source.
- Staged cascade operation reduced burner cycling and wear.
Related case studies
Other projects
Describe your site — an engineer will visit and run the numbers
Site visit, measurements and a technical brief. You receive an itemised estimate and a system layout.
Service desk: +7 777 005-31-01


