Industry · Kazakhstan
Mostootryad-25 — steam boiler plant
Steam boiler plant on SEK-1000 boilers producing 2,000 kg of steam per hour for concrete curing and process needs.

- Steam output
- 2,000 kg/h
- Boilers
- SEK-1000
- Medium
- Saturated steam
Task
The plant needed process steam for curing concrete structures — with fast start-up and reliable operation in winter conditions.
Disciplines
Equipment
- SEK-1000 steam boilers, 2,000 kg/h
What we did
- 01Selected SEK-1000 steam boilers with a combined output of 2,000 kg/h.
- 02Installed the steam plant pipework: feed pumps, deaeration, blowdown, pressure reduction.
- 03Ran the steam mains with thermal expansion compensation and insulation.
- 04Carried out commissioning and performance trials.
Result
- Process steam supports concrete curing through the winter.
- The equipment operates at its rated pressure and output.
Related case studies
Other projects
Describe your site — an engineer will visit and run the numbers
Site visit, measurements and a technical brief. You receive an itemised estimate and a system layout.
Service desk: +7 777 005-31-01