Hydrosta Kazakhstan is the official distributor of HYDROSTA CO LTD in the Republic of Kazakhstan. The company delivers the full engineering cycle: design, equipment supply, installation, commissioning and service. Core areas are heating and boiler plants, water supply and water treatment, ventilation and air conditioning, automatic fire suppression, pumping equipment and automation. We work with industrial, commercial and residential facilities across Kazakhstan, with offices in Almaty and Astana.
in the Kazakhstan market
Since 2008in the Kazakhstan market
HYDROSTA CO LTD
Official DistributorHYDROSTA CO LTD
sales and service
Almatysales and service
representative office
Astanarepresentative office
Real projects
Complex engineering tasks are trusted to us
Medical centres, shopping malls, car dealerships, industrial sites and plants — from design to commissioning.
Almaty Museum of Arts
Dostar Med
Mall APORT
Hawaii Water Park
Mycar.kz
Blue Star (Mercedes-Benz)
Sunkar
Aston Invest
Mostootryad-25
Mostootryad-8
Bakery Plant No. 7
Bounty
Fortune
Mozzarella
EKO
Astana Motors
Toyota Center Almaty
Hyundai Trans Auto
Chery
БЦ Kaisar Plaza
Институт репродуктивной медицины
Аквапарк Sun Remo
Алатау-Су
Almaty Museum of Arts
Dostar Med
Mall APORT
Hawaii Water Park
Mycar.kz
Blue Star (Mercedes-Benz)
Sunkar
Aston Invest
Mostootryad-25
Mostootryad-8
Bakery Plant No. 7
Bounty
Fortune
Mozzarella
EKO
Astana Motors
Toyota Center Almaty
Hyundai Trans Auto
Chery
БЦ Kaisar Plaza
Институт репродуктивной медицины
Аквапарк Sun Remo
Алатау-Су
Almaty/Almaty Museum of Arts
Almaty Museum of Arts
Comprehensive modernization and commissioning of the museum building's engineering systems: heating, ventilation, water supply, sewerage, chilled water and air conditioning
Completed installation of radiator heating collectors, water supply and sewerage systems, thermal curtains, ventilation, floor convectors, heating radiators, supply and exhaust units, outdoor air conditioning units, heating, chilled water and water supply pipelines, heat point, as well as commissioning works and installation of designer ventilation grilles.
Process ventilation installation, assembly of paint booths and ovens, cataphoresis lines, I&C systems, paint pipelines, conveyor equipment, robots, power supply and CCTV
Delivered process ventilation installation, assembly of paint booths and ovens, cataphoresis lines, I&C systems, paint pipelines, conveyor equipment and robots, welding of ovens and baths, power supply and CCTV.
facility area
210,000 sq.mfacility area
process systems
Turnkeyprocess systems
Process ventilationI&C systemsIndustry
Almaty/MEGA Almaty Mall
MEGA Almaty Mall
Smoke extraction, smoke-control ventilation, HVAC, heating, chilled water supply, water supply and sewerage, automation
Installed the smoke extraction system, ventilation and smoke-control ventilation systems, heating, chilled water supply, water supply and sewerage systems, and automation.
facility area
80,000 sq.mfacility area
engineering systems
7 systemsengineering systems
Smoke extractionVentilationChilled water supplyAutomation
Almaty/Sun Remo waterpark
Sun Remo waterpark, Aport Mall East
Steam line feeding the heating registers of the steam rooms
Equipment was supplied and steam lines installed to feed the heating registers of 7 steam rooms with different climates.
facility area
35,000 m²facility area
with different climates
7 steam roomswith different climates
SteamHeatingCommercial
Almaty/Kaisar Plaza business centre
Kaisar Plaza business centre
Equipment supply and installation of water supply systems
Equipment was supplied and the water supply systems of the business centre installed: 8 floors, multi-level parking, usable roof (2016–2018).
total area
33,400 m²total area
plus multi-level parking
8 floorsplus multi-level parking
Water supplyBusiness centre
Almaty/My Car Almaty dealership
My Car Almaty dealership
Redesign of ventilation and heating systems, ductless Flowair solutions
Ventilation and heating systems were redesigned using Flowair equipment without ductwork: the budget was cut by 30% and energy consumption by 50%.
facility area
29,000 sq.mfacility area
budget and energy costs
−30% / −50%budget and energy costs
VentilationHeatingCar centre
Almaty/Plant administrative and amenity complex
Plant administrative and amenity complex
Equipment supply and installation of ventilation and air conditioning systems
Equipment was supplied and ventilation and air conditioning systems installed at the plant's administrative and amenity complex.
facility area
17,000 sq.mfacility area
ventilation and air conditioning
2 systemsventilation and air conditioning
VentilationAir conditioningIndustry
Almaty/Alatau-Su warehouse
Alatau-Su warehouse complex
Design, equipment supply and installation of HVAC and water supply, modular boiler house
The project was designed, equipment supplied and heating, ventilation, air conditioning and water supply systems installed for a warehouse complex with a modular boiler house.
warehouse area
15,000 m²warehouse area
modular boiler house
Modular boiler housemodular boiler house
Boiler roomHVACWarehouse
Almaty/Karasu
Karasu trade and logistics terminal
Modular boiler house and heating system for the terminal
Boiler equipment and the heating system of a 10,000 m² trade and logistics terminal were installed and commissioned.
facility area
10,000 m²facility area
modular boiler house
Modular boiler housemodular boiler house
Boiler roomHeatingLogistics
Almaty/Mall APORT
Hawaii Water Park, APORT Mall
New high-efficiency heating for the sauna zone
A heating system was delivered for 7 exclusive saunas of the water park with high efficiency and a stable temperature regime.
turnkey saunas
7turnkey saunas
high-traffic facility
Mallhigh-traffic facility
HeatingCommercial
Almaty/Car seat manufacturing plant
Car seat manufacturing plant
Heating, ventilation, air conditioning, water supply and automatic water fire suppression
Equipment was supplied and the plant's heating, ventilation, air conditioning, water supply and automatic water fire suppression systems installed (2024).
year completed
2024year completed
engineering systems
5 systemsengineering systems
HVACFire suppressionIndustry
Almaty/PDI shop at the Hyundai Trans Kazakhstan plant
PDI defect rectification shop at the Hyundai Trans Kazakhstan plant
Heating, ventilation, air conditioning, water supply and automatic water fire suppression
Equipment was supplied and heating, ventilation, air conditioning, water supply and automatic water fire suppression systems installed (2024).
facility area
2,000 sq.mfacility area
engineering systems
5 systemsengineering systems
HVACFire suppressionIndustry
Almaty/Transport block
Transport block
Heating, ventilation, air conditioning, water supply and automatic water fire suppression
Equipment was supplied and heating, ventilation, air conditioning, water supply and automatic water fire suppression systems installed (2024).
year completed
2024year completed
engineering systems
5 systemsengineering systems
HVACFire suppressionIndustry
Almaty/Chery dealership centre
Chery dealership centre
Heating, ventilation, air conditioning, water supply and automatic fire suppression
Equipment was supplied and the dealership centre's heating, ventilation, air conditioning, water supply and automatic fire suppression systems installed (2023).
facility area
4,842 m²facility area
engineering systems
5 systemsengineering systems
HVACFire suppressionCar centre
Almaty/MUSAG (Mycar) office at MEGA Mall
MUSAG Office at MEGA Mall
Equipment supply and installation of water supply, sewerage and automatic fire suppression systems
Supplied equipment and installed water supply, sewerage and automatic fire suppression systems for an 850 sq.m office.
area
1,250 m²area
facility area
850 sq.mfacility area
Water supplySewerageFire suppression
Almaty/More&More restaurant
More&More Mediterranean restaurant
Heating, ventilation, air conditioning, water supply and automatic fire suppression
Equipment was supplied and heating, ventilation, air conditioning, water supply and automatic fire suppression systems installed for a three-hall restaurant.
facility area
2,000 sq.mfacility area
hall capacity
up to 180 guestshall capacity
HVACFire suppressionHoReCa
Almaty/Dostar Med
Dostar Med Medical Centre
HVAC and water supply design, block-modular boiler room
Heating, ventilation and water supply systems for the clinic were designed and delivered together with a standalone modular boiler room.
heated area
2,500 m²heated area
boiler room capacity
0.696 MWboiler room capacity
HVACBoiler roomHealthcare
Almaty/Bavaria Car Centre
Bavaria Car Centre
HVAC: in-floor convectors, ducted and cassette fan coils, chillers, chilled-water pumps, air handling units
Installed in-floor convectors, ducted and cassette fan coils, removed and installed chillers, replaced chilled-water pumps, installed and removed air handling units.
facility area
1,400 m²facility area
heating, ventilation, air conditioning
HVACheating, ventilation, air conditioning
HVACAir conditioningCar centre
Almaty/Toyota Center Almaty
Toyota Center Almaty
Heating, ventilation, air conditioning, water supply and automatic fire suppression
Equipment was supplied and the dealership's heating, ventilation, air conditioning, water supply and automatic fire suppression systems installed.
facility area
1,900 m²facility area
engineering systems
5 systemsengineering systems
HVACFire suppressionCar centre
Almaty/Astana Motors office
Astana Motors office
Heating, ventilation, air conditioning, water supply, sewerage and automatic fire suppression
Equipment was supplied and heating, ventilation, air conditioning, water supply, sewerage and automatic fire suppression systems installed in a two-storey office with an atrium.
facility area
2,200 sq.mfacility area
engineering systems
6 systemsengineering systems
HVACFire suppressionOffice
Astana/Concrete plant
Concrete plant: steam boiler room
Steam boiler for heating sand-gravel mix
A steam boiler producing 1,000 kg of steam per hour was installed to heat the sand and gravel mix in winter.
steam output
1,000 kg/hsteam output
year-round cycle
Astanayear-round cycle
SteamIndustry
Almaty/Blue Star (Mercedes-Benz)
Blue Star Mercedes dealership
Repair of infrared gas heaters
Operation of 8 infrared gas heaters in the dealership service area was restored.
heaters
8 unitsheaters
total capacity
400 kWtotal capacity
ServiceGas equipment
Almaty/Sunkar
Sunkar facility
HVAC design and installation
Heating and ventilation systems were designed and installed with a Cronos BB-2035 boiler.
boiler capacity
200 kWboiler capacity
equipment
Cronos BB-2035equipment
HVACInstallation
Almaty/Aston Invest
Aston Invest facility
Cascade of VANS boilers
A cascade of 8 VANS boilers with a total thermal capacity of 400 kW was installed.
VANS cascade
8 boilersVANS cascade
total capacity
400 kWtotal capacity
Boiler roomCascade
Almaty/ТОО «Мостоотряд №25 им. Рязанова А.»
Мостоотряд №25 им. Рязанова А.
Поставка и монтаж паровых котлов SEK-1000 — 2 шт.
Поставлены и смонтированы два паровых котла SEK-1000 с общей паропроизводительностью 2000 кг пара в час.
паровых котла SEK-1000
2 шт.паровых котла SEK-1000
общая паропроизводительность
2000 кг/чобщая паропроизводительность
SteamIndustryInstallation
Almaty/Банный комплекс «Fortune»
Банный комплекс «Fortune»
Поставка и монтаж парового котла SEK-100.
Поставлен и смонтирован паровой котёл SEK-100 паропроизводительностью 100 кг пара в час для банного комплекса.
паровой котёл
SEK-100паровой котёл
паропроизводительность
100 кг/чпаропроизводительность
SteamInstallationHoReCa
Almaty/Mostootryad-8 LLP
Mostootryad-8 LLP
Project design, supply and installation of infrared gas heaters
The project was designed and 14 Adrian-Rad AA 501 infrared gas heaters supplied and installed for the production shop.
Adrian-Rad heaters
14 unitsAdrian-Rad heaters
capacity
666.4 kWcapacity
Gas equipmentIndustry
Almaty/Institute of Reproductive Medicine
Institute of Reproductive Medicine
Design, supply and installation of HVAC and plumbing, modular boiler house
The project was designed and heating, ventilation and water supply systems installed, along with a modular boiler house based on VANS-2000 hot-water boilers.
total capacity
400 kWtotal capacity
hot-water boilers
VANS-2000hot-water boilers
HVACBoiler roomHealthcare
Almaty/Astana Motors at Essentay City
Astana Motors three-storey office building
Ventilation, air conditioning and water supply for an office building
Equipment was supplied and ventilation, air conditioning and water supply systems installed in a three-storey office building (2023).
office building
3 floorsoffice building
year completed
2023year completed
VentilationAir conditioningOffice
Almaty/1,000 sq.m cottage
Private cottage of 1,000 sq.m
Heating, automatic water fire suppression and a modular boiler house
Equipment was supplied and heating, automatic water fire suppression and a 2,600 kW modular boiler house installed.
cottage area
1,000 sq.mcottage area
modular boiler house capacity
2,600 kWmodular boiler house capacity
HeatingBoiler roomPrivate facility
Almaty/Boiler house No. 1, Bukhtarminskaya St.
Modular boiler house No. 1 on Bukhtarminskaya St.
Supply and installation of modular boiler house equipment
Equipment for a 1.7 MW modular boiler house heating 7,400 sq.m was supplied and installed.
modular boiler house capacity
1.7 MWmodular boiler house capacity
heated area
7,400 sq.mheated area
Boiler roomHeating
Almaty/Boiler house No. 2, Bukhtarminskaya St.
Modular boiler house No. 2 on Bukhtarminskaya St.
Supply and installation of modular boiler house equipment
Equipment for a 1.0 MW modular boiler house was supplied and installed.
modular boiler house capacity
1.0 MWmodular boiler house capacity
turnkey
Modular boiler houseturnkey
Boiler roomHeating
Almaty/Hyundai Trans Auto: offices and canteen
Hyundai Trans Auto: offices and canteen
Air conditioning, water supply and heat supply for the administrative block
Comprehensive installation of air conditioning, water supply and heat supply systems was carried out in the administrative block.
facility area
1,400 m²facility area
engineering systems
3 systemsengineering systems
Air conditioningWater supplyHeat supply
Almaty/Offices on Bukhtarminskaya St.
Offices, 2nd floor, Bukhtarminskaya St.
Fire-fighting water main, hose cabinets, power supply and CCTV
A fire-fighting water main with hose cabinets was installed, along with power supply and CCTV for the office floor.
office block
2nd flooroffice block
engineering systems
4 systemsengineering systems
Fire water mainPower supplyCCTV
Almaty/Fire suppression on Bukhtarminskaya St.
Automatic water fire suppression, Bukhtarminskaya St.
Equipment supply and installation of an automatic water fire suppression system
Equipment was supplied and an automatic water fire suppression system installed at the warehouse complex.
automatic fire suppression
Sprinkler systemautomatic fire suppression
facility type
Warehousefacility type
Fire suppressionWarehouse
Almaty/Heating and air conditioning, Bukhtarminskaya St.
Heating and air conditioning, Bukhtarminskaya St.
Equipment supply and installation of heating and air conditioning systems
Equipment was supplied and heating and air conditioning systems installed in a production and warehouse building.
Hydrosta Kazakhstan officially represents HYDROSTA CO LTD in the Republic of Kazakhstan and provides supply, installation, warranty and service maintenance of equipment.
Solutions
Engineering systems by object type
From a private home to a large industrial complex — we select and implement systems based on actual load.
Didn't find an answer? Ask an engineer — we will respond during business hours.
What equipment does Hydrosta supply?
Hydrosta supplies the full range of engineering equipment: Hydro and Hydro Premium gas and diesel boilers, water heaters, burners and convectors; pumping equipment — circulation, borehole and booster pumps, pumping stations; wall-mounted, floor-standing and semi-industrial air conditioners; ventilation heaters and air handling units; plumbing — underfloor heating, radiators, pipes and fittings; industrial equipment; gas generators; plastic tanks from 300 to 5,000 litres, as well as spare parts and boiler-room automation.
What turnkey services does Hydrosta provide?
We cover the entire cycle: site survey and design, equipment selection and supply, installation of heating, water supply, ventilation, air conditioning and fire-fighting systems, boiler-room automation and remote monitoring, manufacturing and commissioning of containerised modular boiler houses, start-up works, warranty and maintenance service with spare parts supply.
What kinds of facilities does the company work with?
We work with private houses and cottages, business facilities (offices, shopping centres, hotels, service stations), industrial plants and factories, oil and gas facilities, mining companies, municipal infrastructure (utilities, schools, hospitals) and the agricultural sector — farms, greenhouses and grain storages.
Do you work across all of Kazakhstan?
Yes. Our offices and warehouses are located in Almaty and Astana, while supply, installation and service are delivered across 14 regions of Kazakhstan — from Atyrau and Aktau to Ust-Kamenogorsk and Petropavlovsk.
Which equipment brands do you supply?
Our own Hydro and Hydro Premium boiler lines as the official distributor of HYDROSTA CO LTD, as well as equipment from Jeil Boiler, Cronos, SUNSYSTEM, Ariston, Wilo, Pedrollo, Leo and other manufacturers.
Do you provide a warranty?
Yes, the warranty covers both the supplied equipment and the installation works. Terms are fixed in the contract.
Do you provide maintenance services?
Yes, we service both our own and previously installed systems: scheduled maintenance, diagnostics, repair, upgrades and spare parts supply.
How can I get a preliminary quote?
Send a request describing your facility and task — an engineer will contact you, clarify the input data and prepare a cost estimate for equipment and works.
Shall we discuss your project?
Describe the task — an engineer will contact you, clarify the initial data, and prepare a solution with an estimated cost.